.

.

Thursday, June 23, 2011

First of the steel stair cases ready for powercoating.

Adrian has done a great job on the single stringer staircase. A bit of a fiddle as it has to fit in an exact space - no room for error. Built in two pieces, it will be a bit of a task to get it inside and assembled.

The timber treads and landing (New Guinea rosewood) will be ready when the steel is back from the powdercoaters. The timber we saved for the job when we sold our furniture manufacturing business.

1 comment:

  1. This comment has been removed by a blog administrator.

    ReplyDelete